Global Infrastructure Partners

Infinite Compute Requires
Infinite Power.

We secure the gigawatts that power the intelligence age. Volterra delivers de-risked, power-committed land bundles for the world's largest AI campuses.

4.2 GW Pipeline Capacity
18 Mo Avg. Time Saved
100% Power Committed

The Bottleneck isn't Silicon.
It's the Grid.

AI model training clusters have scaled from 10MW to 500MW+ in under three years. Traditional utilities cannot adapt. Interconnection queues in Tier 1 markets now average 5-7 years.

Volterra bypasses the queue. We acquire brownfield industrial sites, municipal utility zones, and retired generation assets to create "Powered Land"—shovel-ready sites with signed interconnection agreements.

Time to Energization

Standard Utility Queue (VA/CA) 60-84 Months
Volterra Powered Land 12-24 Months
*Based on PJM/CAISO 2024 interconnection queue data for >100MW loads.

Creating Value in the Physical World

Brownfield Recycling

Acquiring retired industrial plants and coal facilities. We utilize existing high-voltage transmission rights to deliver immediate capacity for AI.

Municipal Arbitrage

Targeting agile Municipal and Co-op utilities outside of congested ISO jurisdictions. We negotiate direct deals for dedicated substations.

💧

Liquid Cooling Ready

Power is nothing without cooling. All Volterra sites are secured with industrial water rights to support next-gen liquid cooling loops.

Representative Assets

Asset ID Market Capacity Status
V-OH-22 (The Foundry) Ohio Valley / PJM 240 MW Ready for Development
V-TX-09 (Lonestar) ERCOT West 600 MW Interconnection Signed
V-AZ-14 (Desert Peak) Phoenix Metro 150 MW Zoning Approved